Ouvrir La Voie   فاتحين المسار

Ouvrir La Voie فاتحين المسار

Freight and Logistics

A Network of Logistics Platforms

A Network of Logistics Platforms

A Network of Logistics Platforms

A Network of Logistics Platforms

Our platforms are located in Fes, Marrakesh, Casablanca and more are being built, serving economic operators, importers and exporters, combining a quality of infrastructure and a host of related services. 

Connecting your work site to the rail network

Connecting your work site to the rail network

Connecting your work site to the rail network

Connecting your work site to the rail network

On-demand services to extend railway lines within customer facilities to provide mass transportation and end-to-end freight forwarding.  

Connection to the ports

Connection to the ports

Connection to the ports

Connection to the ports

Connections to the rail network of the country’s main ports (Casablanca, Jorf Lasfar, Tanger Med and Nador, etc.) and also to docks and terminals to facilitate the removal and unloading of goods.

Combined Rail-road transport

Combined Rail-road transport

Combined Rail-road transport

Combined Rail-road transport

Your goods delivered by rail, truck or a combination of both (combined rail-road transport) while ensuring the best transport conditions, easily adaptable to different types of packaging, containers, bulk, oversized.

Land plots at your disposal for temporary occupation

Land plots at your disposal for temporary occupation

Land plots at your disposal for temporary occupation

Land plots at your disposal for temporary occupation

Plots available located nearby train stations to optimize supply, storage and handling operations. An infrastructure offering large storage capacity for temporary occupation. 

Key Figures

  • Rail network and rolling stock

    Rail network and rolling stock

  • Passenger transport

    Passenger transport

  • Freight and logistics transport

    Freight and logistics transport

  • Human capital

    Human capital

  • Sustainable development

    Sustainable development

    2295 km 

    length of lines

   4723 freight

   wagons

    3848 km length of

    conventional tracks 

   64 % of lines 

   electrified

 

  52,9 millions  

  passengers

 6,9 billion  

 passenger-KM

  63% train

  occupancy rate

  2,56 billion MAD

 of turnover

 17,2 millions 

 tons transported

1,53 billion MAD 

 of turnover

 

 842 thousand tonnes  

  of cereals transported

446 000 cars

transported

  6 916 

 collaborators

  6% 

  training budget/payroll

  651 

  collaborators recruited

  13

  days of training/collaborator

 

  0,47 % share of 

GHG emissions in Morocco

 2,6 % share of ONCF 

 of GHG emissions in the transport sector 

 -20 % change in GHG

 emissions in 2023 compared with 2022